S.N 12 - Datang International Beijing Gaojing Power Plant
Project location: Beijing, Shi Jing Shan
Equipment selection: 2 unit 1744KW hot water LiBr absorption chiller
Main function: Utilize waste heat of steam condensate to make 7℃ chilled water for using refrigeration.
General introduction
Overview of the Power Plant:
- Total Installed Capacity: 600,000 kW, comprising:
- 6 units of 100,000 kW power generation units.
- 8 units of boilers to support both power and heat production.
- External Heating Area: Serves an extensive area of 5,080,000 m² (5.08 million square meters).
Key Role and Contributions:
- Energy Supply: The plant is a critical power supply support point for Beijing, ensuring the region receives reliable electricity, which is vital for both residential and industrial needs.
- Heat Supply: In addition to generating power, it plays a key role in providing high-quality, cost-effective heat to the city, improving energy efficiency and making a substantial contribution to Beijing's heating needs.
- Economic Impact: By providing affordable and reliable heating, the plant supports socio-economic development and improves the living standards of local residents by reducing heating costs, particularly during the colder months.
Strategic Importance:
- The power plant’s dual role in power generation and district heating helps optimize resource usage and creates a more sustainable energy model for the capital.
- With its large installed capacity and substantial heating area coverage, it positions the plant as an essential asset in Beijing's energy infrastructure, supporting the city's growth and the government’s energy security goals.
Web: https://www.deepbluechiller.com/
E-Mail: yut@dlhope.com / young@dlhope.com
Mob: +86 15882434819/+86 15680009866
Post time: Mar-30-2023