Hope Deepblue Air Conditioning Manufacture Corp., Ltd.
Guoneng Chongqing Power Plant

Solution

Project location: Wansheng District, Chongqing City
Equipment selection:1450KW LiBr Steam-fired Absorption Chiller
Main function: Using the waste heat from waste power plants; improve the utilization of heat energy.

S.N 28 - Guoneng Chongqing Power Plant

steam fired absorption chiller
Steam fired absorption chiller
eeea16a14274acfd9d7b340506337d6
Steam fired absorption chiller

Post time: Mar-28-2025